Project Description

This ramp was literally falling apart when we were called in to save the day. These are the before pictures – the after pics will be uploaded shortly!
  • RAMP LENGTH: 50 FT
  • STRUCTURE WEIGHT: 3 TONS STEEL, GALVANIZED
  • PROJECT VALUE: $60.000
  • LOCATION: SCHUMACH ST, TORONTO
  • FABRICATION 2 WEEKS. ERECTION 1 WEEK
  • ENGINEER: WELDPLUS