Project Description
This ramp was literally falling apart when we were called in to save the day. These are the before pictures – the after pics will be uploaded shortly!
- RAMP LENGTH: 50 FT
- STRUCTURE WEIGHT: 3 TONS STEEL, GALVANIZED
- PROJECT VALUE: $60.000
- LOCATION: SCHUMACH ST, TORONTO
- FABRICATION 2 WEEKS. ERECTION 1 WEEK
- ENGINEER: WELDPLUS