Project Description
Structural building modification
This warehouse needed additional space for a refrigerated storage solution, so we supplied the structural steel for the project.
Project Info:
- GROSS FLOOR AREA: 1000 SQ. FT
- STRUCTURE WEIGHT: 10,000 LB STEEL
- PROJECT VALUE: $80.000
- LOCATION: FLINT ROAD, TORONTO
- FABRICATION 1 WEEK. ERECTION 1/2 WEEK
- EQUIPMENT SUPPLIER: HERC RENTALS
- JLG 340AJĀ + GENIE Z-34/22 + JLG 1255
- ENGINEER: VVCEM INC.
- CWB INSPECTION: ACE TAKE GROUP
- DECK SUPPLIER: CAN AM P3606 22 GA. G90